The project area, measuring approximately 340 ha, is situated to the east of the large, elliptical-shaped roundabout, which is at the northern tip of Dubai Investment Park, on the Emirates Road.
Work comprised; grading works, road works, consisting of dual 3-lane and 2-lane carriageway roads; single carriageway roads, service roads-D road along the Emirates Road; people movers lanes; cycle path; off street parking; signalised junctions; and roundabouts, a foul sewerage collection system, a storm water drainage system, irrigation network, district cooling system, lighting of the road network, electricity services, water distribution network, telecommunication works, dedicated fire-fighting water supply network, three architectural gateways, two gatehouse and control building including a facility management system.