The project is located in the eastern part of Dubai urban area, running north south direction, bounded by Jebel Ali / Al Hebab to the north and trucks road to Dubai/ Abu Dhabi border to the south, and parallel to the Emirates Road (311) to the west.
The proposed highway has an approximate length of 25 km, which is a continuation of Dubai Bypass Phase III at a total length of approximately 23km. The contract comprises the construction of 12 lane divided carriageway with inner and outer shoulders, separated by a wide central reservation, with one line of single guard rail. The work will also include the construction of three underpasses associated with four ramps and two roundabouts at both ends to form an interchange arrangement, which allows U-turn facilities. The work also includes the provision of street lightning services to the proposed highway facility, crossing ducts for different utilities and the relocation and/ or protection of existing services affected by the proposed highway scheme.