This project was for the Improvement of the Interchange at the intersection of Emirates Road with EXPO Road and Jebel Ali Lehbab Road. The project was part of the road improvements provided for the 300,000 visitors expected daily at Expo 2020. The scope of works comprised construction of a four leaf clover interchange with a directional ramp, widening of the the existing Jebel Ali Lehbab Road from 4 lanes to 6 lanes in each direction and all associated works. Existing utilities were to be relocated to provide new corridors, one particular challenge was protecting and taking care of the existing DUSUP corridors.