The project consist of an additional two-lane ramp connecting the Al Khail road to the existing upper deck of the Financial Centre Road.
The project area included the development of any required interchanges/ intersections as might be needed, at the point on integrating the proposed alignment to the existing alignment, accessibility, parking requirements, pedestrian movement, cyclist movement, disabled users movement, calming measures, traffic circulation and public buses circulation.