This project comprised the construction of 3 access bridges to Deira Islands (2 lane directional ramps) and the connection with the existing 6×6 bridge crossing over the water channel. The total length of the bridge on the Deira mainland side of the project is 1.6 km, and the extension of the 6×6 bridge on the Deira Island side is approximately 140m long.