The project is located on both sides of Dubai Water Canal near Safa Park. The scope of work involved the construction of all infrastructure works required for the development of plots including roads and utilities such as Water, Electricity works, including NDRC under Sheikh Zayed Road, distribution substation, cable relocation, telecommunication networks, DM irrigation and drainage works (the drainage works includes outfall structure and petrol interceptor and the sewerage works includes removal of existing pipes and manholes), road lighting works (including the removal of existing lighting columns/feeder pillars, installation of lighting columns, power cabling and earthing system, traffic signal works), fire-fighting and fire hydrant works, irrigation and fire pumping station, RTA spare ducts etc.